Dealer Pricing
Current authorized dealer pricing. Do not distribute externally.
| Product | SKU | Unit | Dealer Price | Notes |
|---|---|---|---|---|
BuilderBracket SB-BB-PR |
SB-BB-PR | Pair | $125.00 | Recessed ceiling install bracket with cover snap system. One pair per opening. |
H-Bar SB-HB-8 |
SB-HB-8 | 8′ stick | $25.00 | Horizontal channel. Cut to size on site. |
Pile Holder SB-PH-8 |
SB-PH-8 | 8′ stick | $25.00 | Holds pile weatherstrip. Cut to size on site. |
Top Trim SB-TT-8 |
SB-TT-8 | 8′ stick | $30.00 | Ceiling / top of opening finish trim. |
Bottom L-Angle SB-LA-8 |
SB-LA-8 | 8′ stick | $25.00 | Floor / sill angle. Cut to size on site. |
Brick Clip SB-BC-EA |
SB-BC-EA | Each | $8.00 | For masonry column installs. Qty varies by opening height. |
Prices are dealer net. For volume quotes on orders of 10+ units of any single product, contact mike@screenbrackets.com. Pricing subject to change with 30 days notice to active dealers.
Place an Order
Build your order below. We'll confirm by email and follow up with shipping details.
Installation Resources
Downloads and illustrated installation diagrams for your team.
File Downloads
JPEG
Roller Install Guide
PDF
BrickBracket Installation Steps
Reference
Cavity Sizing Chart
PDF
Product Spec Sheet
Installation Diagrams
BuilderBracket — Recessed Ceiling Cross-Section
Shows bracket position inside ceiling cavity, J-box location, roller tube, and snap-on cover
1Attach BuilderBrackets to ceiling framing on each side of the opening before drywall or finish work.
2Install J-box inside bracket on preferred side for electrical drop.
3Set roller tube between brackets. Brackets hold tube during install — no extra supports needed.
4Snap cover onto bottom of brackets. Cover width sets the final cavity dimension for your builder.
5Cover removes by hand for service access — no tools required.
Extrusion Profiles — Cross-Sections
Profile view of each aluminum extrusion showing shape, placement, and relationship to screen opening
HH-Bar — Runs vertically on each side of the opening. Screen edges track inside the H channel for guided travel.
PPile Holder — Runs alongside H-Bar. Holds pile weatherstrip that seals against the screen edge to block light and air.
TTop Trim — Fastens to ceiling at head of opening. Covers the raw structural edge and gives a clean finished look.
LBottom L-Angle — Anchors to sill or floor at base of opening. Screen drops to this point when fully extended.
Brick Clip — Masonry Column Detail
Plan view (top-down) showing brick column, wood framing, u-channel, and brick clip placement
1Set wood framing members inside the column cavity on each side of the screen opening, plumb and at correct spacing.
2Attach Brick Clips to face of each wood member. Clips lock against the brick to hold framing position during pour.
3Mount u-channels to the face of the wood framing. Screen will track inside these channels.
4Fill column cavity with mortar. Brick Clips hold everything in alignment while mortar cures.
5Install screen roller above opening. Screen drops into u-channels on extension.
Need a resource not listed? Email mike@screenbrackets.com and we'll get it to you directly.
Dealer Support
Direct access — no ticket system, no hold queue.
Email
Orders, spec questions, job site help. Best for anything needing documentation.
Location
Edmond, Oklahoma
107 South Fretz Avenue, Edmond, OK 73003
Response Time
Same or next business day
Monday – Friday. Mark subject "URGENT" for same-day job site questions.